检索范围:
排序: 展示方式:
West-East Gas Pipeline Project
Junqiang ZHANG, Honglong ZHENG, Wenyuan HE, Weihe HUANG
《工程管理前沿(英文)》 2020年 第7卷 第1期 页码 163-167 doi: 10.1007/s42524-019-0056-x
JIA Haifeng, WEI Wei, XIN Kunlun
《环境科学与工程前沿(英文)》 2008年 第2卷 第1期 页码 57-62 doi: 10.1007/s11783-008-0013-0
关键词: diameter Beijing municipal reclaimed planning elevation
Experimental investigations on operating characteristics of a closed loop pulsating heat pipe
Yu WANG
《能源前沿(英文)》 2015年 第9卷 第2期 页码 134-141 doi: 10.1007/s11708-015-0354-x
关键词: closed loop pulsating heat pipe thermal performance operation limit thermography
胡程顺,毛校君
《中国工程科学》 2007年 第9卷 第10期 页码 71-74
土石方工程由于施工过程的复杂及受到众多随机因素的影响,很难用人工方法精确计算各道路的行车及排队情况,确定各道路的等级以及施工机械设备的数量。采用循环网络模拟技术,用挖、装、运、卸等仿真节点来模拟实际施工的相应过程,建立能反映土石方实际开挖过程的仿真模型。仿真得出的一系列施工参数为辅助管理人员做出决策提供参考依据。某工程中的成功应用表明,此方法快捷、便利,值得深入研究并推广应用。
A new technique for islanding operation of distribution network connected with mini hydro
J. A. LAGHARI,H. MOKHLIS,M. KARIMI,A. H. A. BAKAR,Hasmaini MOHAMAD
《信息与电子工程前沿(英文)》 2015年 第16卷 第5期 页码 418-427 doi: 10.1631/FITEE.1400309
关键词: Islanding operation Mini hydro Distributed generation (DG) Islanding detection Load shedding
Major applications of heat pipe and its advances coupled with sorption system: a review
Yang YU, Guoliang AN, Liwei WANG
《能源前沿(英文)》 2019年 第13卷 第1期 页码 172-184 doi: 10.1007/s11708-019-0610-6
关键词: heat pipe sorption system heat transfer solid sorption heat pipe
王孟钧,张镇森
《中国工程科学》 2011年 第13卷 第8期 页码 62-66
笔者从重大建设工程技术创新的特点和现状分析入手,剖析制约重大建设工程技术创新的核心障碍,建立面向重大建设工程技术创新网络的基本架构,分析其形成起点、演化路径和整合方式,探讨技术创新网络的动力机制、协同机制和学习机制,为建立跨组织协同的新型技术创新模式,提高重大建设工程技术创新效率和水平提供理论依据。
崔慧,吴长春,吴江林,孙青峰
《中国工程科学》 2004年 第6卷 第8期 页码 69-73
东北原油长输管网是中国规模最大的地区性原油运输系统,就该管网基于峰谷电价体制下的运行现状,建立了线性规划数学模型,提出了日输油计划优化问题,并以铁秦线为例进行分析;初步揭示了峰谷电价体制下日输油计划方式的一些基本规律, 表明在该体制下东北管网具有一定的节能降耗潜力。但该方式在一定程度上受到管道本身运行特性的约束,与热油管道相比它更适合于等温管道。
Design and analyses of open-ended pipe piles in cohesionless soils
Yuan GUO,Xiong (Bill) YU
《结构与土木工程前沿(英文)》 2016年 第10卷 第1期 页码 22-29 doi: 10.1007/s11709-016-0314-5
Group-based multiple pipe routing method for aero-engine focusing on parallel layout
《机械工程前沿(英文)》 2021年 第16卷 第4期 页码 798-813 doi: 10.1007/s11465-021-0645-3
关键词: multiple pipe routing optimization algorithm aero-engine pipe grouping parallel layout
A review of nondestructive examination technology for polyethylene pipe in nuclear power plant
Jinyang ZHENG, Yue ZHANG, Dongsheng HOU, Yinkang QIN, Weican GUO, Chuck ZHANG, Jianfeng SHI
《机械工程前沿(英文)》 2018年 第13卷 第4期 页码 535-545 doi: 10.1007/s11465-018-0515-9
Polyethylene (PE) pipe, particularly high-density polyethylene (HDPE) pipe, has been successfully utilized to transport cooling water for both non-safety- and safety-related applications in nuclear power plant (NPP). Though ASME Code Case N755, which is the first code case related to NPP HDPE pipe, requires a thorough nondestructive examination (NDE) of HDPE joints. However, no executable regulations presently exist because of the lack of a feasible NDE technique for HDPE pipe in NPP. This work presents a review of current developments in NDE technology for both HDPE pipe in NPP with a diameter of less than 400 mm and that of a larger size. For the former category, phased array ultrasonic technique is proven effective for inspecting typical defects in HDPE pipe, and is thus used in Chinese national standards GB/T 29460 and GB/T 29461. A defect-recognition technique is developed based on pattern recognition, and a safety assessment principle is summa-rized from the database of destructive testing. On the other hand, recent research and practical studies reveal that in current ultrasonic-inspection technology, the absence of effective ultrasonic inspection for large size was lack of consideration of the viscoelasticity effect of PE on acoustic wave propagation in current ultrasonic inspection techno-logy. Furthermore, main technical problems were analyzed in the paper to achieve an effective ultrasonic test method in accordance to the safety and efficiency requirements of related regulations and standards. Finally, the development trend and challenges of NDE test technology for HDPE in NPP are discussed.
关键词: polyethylene pipe nuclear power plant ultrasonic inspection nondestructive testing safety assessment
Calculation method of load distribution on pipe threaded connections under tension load
Shoujun CHEN, Lianxin GAO, Qi AN
《机械工程前沿(英文)》 2011年 第6卷 第2期 页码 241-248 doi: 10.1007/s11465-011-0219-x
This paper presents a new calculation method that can calculate the load distribution on pipe threaded connections under tension load. On the basis of elastic mechanics, the new method was developed by analyzing each thread tooth, and a new deformation and covariant equation by making a mechanics analysis on each thread tooth was obtained. Compared with the traditional method proposed by the previous references, the new deformation and covariant equation could be used to describe the relation between the previous and the next thread tooth. By applying the new method on the sample of P-110S pipe threaded connection, the obtained results show that the load on thread tooth mainly concentrates on the four or five threads engaged and the middle teeth were not utilized well to bear the loads. The model offers a new way to calculate the loads carried on the thread teeth under tension load.
关键词: load distribution calculation method pipe threaded connections tension load
NC flame pipe cutting machine tool based on open architecture CNC system
Xiaogen NIE, Yanbing LIU
《机械工程前沿(英文)》 2009年 第4卷 第2期 页码 147-152 doi: 10.1007/s11465-009-0025-x
关键词: flame pipe cutting flame incision tracks CNC open architecture CNC system
Branch-pipe-routing approach for ships using improved genetic algorithm
Haiteng SUI,Wentie NIU
《机械工程前沿(英文)》 2016年 第11卷 第3期 页码 316-323 doi: 10.1007/s11465-016-0384-z
Branch-pipe routing plays fundamental and critical roles in ship-pipe design. The branch-pipe-routing problem is a complex combinatorial optimization problem and is thus difficult to solve when depending only on human experts. A modified genetic-algorithm-based approach is proposed in this paper to solve this problem. The simplified layout space is first divided into three-dimensional (3D) grids to build its mathematical model. Branch pipes in layout space are regarded as a combination of several two-point pipes, and the pipe route between two connection points is generated using an improved maze algorithm. The coding of branch pipes is then defined, and the genetic operators are devised, especially the complete crossover strategy that greatly accelerates the convergence speed. Finally, simulation tests demonstrate the performance of proposed method.
关键词: branch pipe ship industry piping system optimization algorithm
Assessment of glass fiber-reinforced polyester pipe powder in soil improvement
《结构与土木工程前沿(英文)》 2021年 第15卷 第3期 页码 742-753 doi: 10.1007/s11709-021-0732-x
关键词: shallow foundation sandy soil bearing capacity soil improvement pipe powder
标题 作者 时间 类型 操作
Hydraulic model for multi-sources reclaimed water pipe network based on EPANET and its applications in
JIA Haifeng, WEI Wei, XIN Kunlun
期刊论文
Experimental investigations on operating characteristics of a closed loop pulsating heat pipe
Yu WANG
期刊论文
A new technique for islanding operation of distribution network connected with mini hydro
J. A. LAGHARI,H. MOKHLIS,M. KARIMI,A. H. A. BAKAR,Hasmaini MOHAMAD
期刊论文
Major applications of heat pipe and its advances coupled with sorption system: a review
Yang YU, Guoliang AN, Liwei WANG
期刊论文
A review of nondestructive examination technology for polyethylene pipe in nuclear power plant
Jinyang ZHENG, Yue ZHANG, Dongsheng HOU, Yinkang QIN, Weican GUO, Chuck ZHANG, Jianfeng SHI
期刊论文
Calculation method of load distribution on pipe threaded connections under tension load
Shoujun CHEN, Lianxin GAO, Qi AN
期刊论文
NC flame pipe cutting machine tool based on open architecture CNC system
Xiaogen NIE, Yanbing LIU
期刊论文